Boiler Replacement $50,000
The functional but inefficient boiler was installed when the Chapel was
built in 1966. It will be less expensive to have a scheduled replacement
as opposed to having to do so in an emergency.
Church Renovations – Phase One 2003-2006 $225,000
During Phase One of the Church Renovation project we will commission an
architect to develop a Master Plan and conduct a lighting study to improve
the lighting in the Chapel.
Replace the Old Apartment Roof $7,500
The roof on the old apartment is deteriorating and needs to be replaced in
order to prevent structural and interior damage due to roof failure.
Parking Lot Resurfacing $100,000
The parking lot must be resurfaced to prevent injuries and to prevent
further damage that will be more costly to repair if neglected.
Repair the Sidewalks on the West Side $5,000
Poor sidewalk drainage on the west side of the building creates hazardous
conditions. We will improve drainage and repair the sidewalk to improve
safety and aesthetics.
Tile Work in the Upstairs Restrooms $5,000
The current wall coverings are stained and difficult to keep clean. We
propose to tile the walls to improve aesthetics and maintenance of the
restrooms.
Family Assist Restroom $15,000
There is a need for a restroom that will allow family members to assist
other family members when necessary.